Sr. No. |
Project Name |
Client Name |
40 |
Electricity Bulk Supply for Packages Mall
Design, Procurement Consultancy, Construction Installation with Testing and Commissioning of 132kV Single ISO Bay Grid Station for Packages Mall |
PACKAGES CONSTRUCTION COMPANY / PACKAGES LIMITED |
39 |
Design Supply Procurment Consultancy Civil Works Installation Testing & Commissioing of 132kv Packgaes Industrial Grid Station(Renovation & Relocation) Shahrah-e-Roomi Amer Sidhu Lahore |
PACKAGES LIMITED |
38 |
7 Story Commercial Plaza at Ex Park View DHA Phase-8 Lahore
Design, Procurement of Material including Lifts, Construction and Installation of Accessories for 08 Marla Commercial Plaza 39 CCA DHA VIII Lahore |
RAFAY HEIGHTS |
37 |
Design / Conversion of Typical Substation Foundations to Pile Foundations including Calculations and Approval. |
PEL |
36 |
132kV Grid Station Noor Sar & Miran Pur (MEPCO) Substation Electrical Primary Drawings, Secondary Design, Civil Design. |
NEIE-AI-Hussain (JV)/ MEPCO |
35 |
Construction of 02 Kanal Residential House at 39-B Izmir Housing Soceity Lahore-2015. |
Haji Muhammad Shabbir Ch. |
34 |
Desging and Drawings with Approval from Barqaab Consulting Services for 220kV Substation SwitchYard Drawings for 220/132kV Kassowal Substation. |
TBEA Consortium China |
33 |
Design, Supply Installation of Switch Yard Lightening Equipment for 220kV Kassowal Substation. |
TBEA Consortium China |
32 |
Design Supply Installation of CRC Sheets Trench Hangers for 220/132kV Chistian Substation. |
NEIE China |
31 |
Repair & Maintaince Works At Residential Quarters Islamabad 2013-2014. |
Government Organization (Ministry of Defence) |
30 |
Construction of 01 Kanal Residential Plot at 18-C Block B River View Housing Soceity Lahore-2015. |
Aamir Shafique |
29 |
Construction of Residential Plot at 90-E Jublee Town, Lahore 2300 Sq. Ft. on Turn Key Basis -2013. |
Muhammad Afzal |
28 |
Fabrication, Supply of Termination Material and Other Allied Material for Utilization on Extension Work at 220/132kV Grid Station Mangla-2010. |
WAPDA / Executive Engineer, 500kV (EHV) T/L 'C' Division NTDC, Rawalpindi. |
27 |
Re-location of 132kVTransmission Line Passing through the premises of Packages Limited Factory 2010. |
Packages Limited |
26 |
Supply Fabrication and Fixing at Site of M.S. Steel Relay Panel Trench Consistinting of 50 x 50 x 60 mm Frame 40 x 4 MM G.l. Strip and 14 SWG Steel Duly Grouted in RCC Floor at 220/132kV Grid Station Mangla-2010. |
WAPDA / Executive Engineer , 500kV (EHV) T/L 'C' Division NTDC, Rawalpindi |
25 |
Conversion of 220kV Control Pannel C-1 Control Desk for Mangla Grid Station ( Control Building). |
WAPDA / Executive Engineer , 500kV (EHV) T/L 'C Division NTDC, Rawalpindi |
24 |
Fabrication & Supply of Material for Temporary Commissioning of D-15 220kV Line Bay on Extension Work at 220/132kV Grid Station Mangla. |
WAPDA / Executive Engineer , 500kV (EHV) T/L 'C' Division NTDC, Rawalpindi |
23 |
Fabrication and Supply of Different Erection material for Utilization on Extension Work at 220/132kV Grid Station, Mangla. |
WAPDA / Executive Engineer , 500kV (EHV) T/L 'C' Division NTDC, Rawalpindi |
22 |
Fabrication and Supply of Different Erection material for Utilization on Extension Work at 220/132kV Grid Station, Mangla. |
NTDCL EHV Islamabad |
21 |
Renovation of Alteration of House No. 785 B Shadman Lahore. |
Mr. Atif Hanif |
20 |
Renovation / Replacement of Wood Work & Interior Finishing Works at House No. 256 X DHA Lahore. |
Khawaja Ghazanfar Adil |
19 |
Renovation / Replacement of Wood Work & Interior Finishing Works at PCSIR Housing Soceity Lahore. |
Sheikh Zia Ul Islam |
18 |
Construction of Residential Plot No. 359 N Defenece Housing Authority, Lahore. |
Mr. Mukhtar Ahmed Bhatti |
17 |
Installation of Transformer Protection System at 160MVA Auto Transformer at 220kV Kassowal. |
TBEA Consortium China / NTDCL EHV-I |
16 |
Installation of Transformer Protection System of Surgi System of France on 02 Nos. 160MVA Auto Transformer of TBEA China Make at 220kV AIS Grid Station Kassowal. |
TBEA Consortium China / NTDCL EHV-I |
15 |
Designing & Drawing Switch Yard Layout, Foundation Plan, Cables Trench layout Plan, Switch Yard Lighting , Control House Building Electrification , Control House Building Lightening Protection , OGST Tank Structure. |
NTDCL EHV-I / TBEA Consortium China |
14 |
Re-Routing of 132kV Double Circuit Transmission Line (Old Kot Lakh Path to Gazi Grid Station) For M/s. |
Packages Limited Shahrah e Roomi Amer Sidhu Lahore |
13 |
Re-Routing of 132kV Transmission Line Passing Inside M/s. Packages Limited Lahore Factory i.,e Client , Including transformation from Pylon Tower to Poles , Including Management Supervision and Consultancy for Civil Works , Procurement of Material ,Installation , Stringing , testing & Commissioning. |
Packages Limited Shahrah e Roomi Amer Sidhu Lahore |
12 |
Design, Fabrication , Installation at Site of CRC Sheet Trench Hanger , Trays , Cable Ladders , for 220/132kV Chistian Substation. |
NEIE China |
11 |
Design , Fabrication , Installation of Transformer Banks Oil Drainage through Seamless Pipes buried underground. |
500kV Shikarpur Substation / NEIE China |
10 |
Design of Piling Foundation of substation equipment foundations for PEL Pakistan ( Conversion from Typical Foundation to Pile Foundations, Drawings and Calculation). |
PEL , Consultant : EnMasse-M.E. Consult (JV) |
9 |
Design Supply Installation of Switch Yard Lighting at 220kV Kassowal Substation |
TBEA Consortium China |
8 |
Fabrication of Switch Yard Fence , Switch Yard Gate as per WAPDA/NTDC Specifications to 132kV Grid Station Noor Sur , Miran Pur , Packages Mall Grid Station |
NEIE-AI-Hussain (JV) / Packages Limited |
7 |
Supply of Termination Material for Installation Works at 500/220kV Substation Shikarpur. |
NEIE China |
6 |
Supply of Stainless Steel Nut Bolts Washer (304) at 500/220kV Substation Shikarpur. |
NEIE China |
5 |
Fabrication & Supply of Copper Nut Bolts and Washers at 500/220kV Substation Shikarpur. |
|
4 |
Fabrication and Supply of Copper Thimbles ( Size upto 185 mm Sq.) for Termination Works at 220/132kV Chistian Substation and 500/220kV Shikarpur Substation. |
|
3 |
Desgin , Fabrication , Installation of Distribution Boards as per Drawings approved from NTDC Desgin for 220/132kV Chistian Substation and 500/220kV Shikarpur Substation. |
NEIE China |
2 |
Supply of Scaffolding Pipes , Clamps , Tools & Plants for Substation and Transmission Lines Erection and Stringing Works. |
NEIE China |
1 |
Supply of Testing and Commissioning Equipment for 132kV Noor Sar / 132kV Miran Pur Grid Station. |
Al-Hussain Traders Contractors Engineers Johar Town Lahore |